Jeff’s Beverage

A pre-engineered metal building (PEMB) with wood framing, Jeff’s Beverage is a retail facility designed to withstand high winds and support forklift loading, providing a functional space with a strong foundation and efficient design.

Project Description

Jeff’s Beverage is an 8,000 sf retail facility designed as a pre-engineered metal building (PEMB) with wood-framed exterior walls and a second floor. Located in a high-wind region, the foundation design was critical to ensure the building is properly anchored, addressing potential uplift forces. The structural system also included a slab designed for forklift loading, ensuring functionality and durability for its retail use.

The key challenge was designing a foundation that could handle substantial uplift forces due to the building’s wind load requirements. Additionally, ensuring the slab design could handle forklift loading was crucial for the facility’s operational needs.

The solution involved a detailed foundation plan, including anchor bolt and footing designs to ensure proper connection to the foundation. The second floor framing plan and perimeter wall design were tailored to meet local building codes, ensuring safety and stability. Structural sections were refined to account for the building’s unique requirements.

The design improvements focused on ensuring the foundation could withstand the uplift forces in the high-wind area. The forklift loading considerations ensured the building’s functionality as a retail space, maximizing both safety and usability for the client.

The project was successfully completed, providing Jeff’s Beverage with a safe, functional retail space built to withstand the region’s high winds while being structurally sound for everyday operations. The use of PEMB and wood framing resulted in a cost-effective, efficient design that met the client’s needs.

Summary

-

The Jeff’s Beverage project exemplifies efficient structural design with an emphasis on safety and functionality. The collaboration between Ainsworth Designs, Dewitt Tilton Group, and 29e6 ensured that the facility’s foundation, framing, and slab were designed to meet high-wind requirements while supporting the client’s operational needs.